| IPO Date | December 26, 2025 to December 30, 2025 |
| Listing Date | January 2, 2026 |
| Face Value | ₹ 10 / Share |
| Price Band | ₹ 164 to ₹ 174 / Share |
| Lot Size | 800 Shares |
| Total Issue Size | 48,40,000 shares (Aggregating up to ₹84.22 Cr) |
| Fresh Issue | |
| Offer for Sale | |
| Employee Discount | |
| Issue Type | Bookbuilding IPO |
| Listing At | NSE SME |
| Share holding pre issue | 1,24,17,570 shares |
| Share holding post issue | 1,72,57,570 shares |
| Market Maker portion |
E to E Transportation Infrastructure IPO opens on December 26, 2025, and closes on December 30, 2025.
| IPO Open Date | December 26, 2025 |
| IPO Close Date | December 30, 2025 |
| Basis of Allotment | December 31, 2025 |
| Initiation of Refunds | January 1, 2026 |
| Credit of Shares to Demat | January 1, 2026 |
| Listing Date | January 2, 2026 |
| Cut-off time for UPI mandate confirmation | December 30, 2025 |
Investors can bid for a minimum of 1,600 shares and in multiples of 800 shares thereof. The following table depicts the minimum and maximum investment by Individual Investors (Retail) and HNI in terms of shares and amount.
| Application | Lots | Shares | Amount |
|---|---|---|---|
| Retail (Min) | 2 | 1,600 | Rs.278,400 |
| Retail (Max) | 2 | 1,600 | Rs.278,400 |
| S-HNI (Min) | 3 | 2,400 | Rs.417,600 |
| S-HNI (Max) | 7 | 5,600 | Rs.974,400 |
| B-HNI (Min) | 8 | 6,400 | Rs.1,113,600 |
| HNI (Min) |
| Share Holding Pre Issue | 45.19% |
| Share Holding Post Issue | 32.51% |
E to E Transportation Infrastructure IPO offers a total of 48,40,000 shares. Out of which 22,96,800 (47.45%) allocated to QIB, 9,19,200 (18.99%) allocated to QIB (Ex- Anchor), 6,89,600 (14.25%) allocated to NII, 16,09,600 (33.26%) allocated to RII, and 13,77,600 (28.46%) allocated to Anchor investors.
| Investor Category | Shares Offered | Maximum Allottees |
|---|---|---|
| Anchor Investor Shares Offered | |
|
| Market Maker Shares Offered | 2,44,000 (5.04%) |
|
| Other Shares Offered | |
|
| QIB Shares Offered | 22,96,800 (47.45%) |
|
| NII (HNI) Shares Offered | 6,89,600 (14.25%) |
|
| bNII > ₹10L | |
|
| sNII < ₹10L | |
|
| Retail Shares Offered | 16,09,600 (33.26%) |
|
| Employee Shares Offered | |
|
| Total Shares Offered | 48,40,000 (100.00%) |
| Bid Date | |
| Shares Offered | |
| Anchor Portion Size (In Cr.) | |
| Anchor lock-in period end date for 50% shares (30 Days) | |
| Anchor lock-in period end date for remaining shares (90 Days) |
Incorporated in 2010, E To E Transportation Infrastructure Limited is an ISO 9001:2015 certified company engaged in providing system integration and engineering solutions for the railway sector.
Service Offerings: Signaling and Telecommunications (S&T), Overhead Electrification (OHE), Track Projects and System Integration, Private Sidings, and Engineering Design and Research Centre (EDRC). The company operates across mainline, urban transit, and private siding segments, offering end-to-end rail engineering services including design, procurement, installation, and testing.
The company’s expertise spans signaling and telecommunication systems, track electrification, and turnkey railway infrastructure projects involving civil and track components. Over the years, it has executed projects for zonal railways, public sector undertakings under Indian Railways, corporate entities with private rail sidings, and infrastructure development companies in India and select international markets.
Its major projects include CBTC signaling for Hyderabad and Nagpur Metro, signaling and telecommunication modernisation for Vizag Steel Plant and NUPPL Power Plant, electronic interlocking system upgrades for Hosur–Salem, siding expansion for Gujarat Pipavav Port with DFCC connectivity, and platform screen door installations for Mumbai Metro Line 3 and Chennai Metro Phase 1.
As of Sep 30, 2025, the company’s order book comprised 50 ongoing contracts valued at ₹40,110.37 lakhs.
As of Nov 30, 2025 the company has 353 full time employees.
Competitive Strengths
KPI as of Mon, Mar 31, 2025.
| KPI | Values |
|---|---|
| ROE | 15.72% |
| ROCE | 15.69% |
| Debt/Equity | 0.57 |
| RoNW | 12.39% |
| P/BV | 1.86 |
| PAT Margin (%) | 5.73% |
| Pre IPO | Post IPO | |
|---|---|---|
| EPS (Rs) | 11.27 | -8.68 |
| P/E (x) | 15.44 | -20.05 |
E to E Transportation Infrastructure 10th Floor, Sattva Galleria |
MUFG Intime India Pvt.Ltd.
|